FCP invested in vertical dry-casting plant and equipment, not only for reinforced concrete pipe, but for stormwater pits. This technology delivers reinforced pipes and pits with increased speed and consistency for civil contractors.
Frankston Concrete operates a fleet of trucks with 10 tonne cranage. For external transport drivers, loading at site is possible with our overhead crane and directive loading bays to ensure everyone’s work safety.
Testimonials